
Mobile Swing Ride 16
Trailer-based flying chair ride with removable tower sections. Fits a standard 20ft container truck, includes self-levelling outriggers and quick-connect wiring for event touring.
| Capacity | 16 riders |
| Power | 22 kW |
| Size | 9m height, 8m swing diameter |
| Age Range | 6+ years |
| Material | Steel tower, FRP seats with double harness |
Product Overview
The Mobile Swing Ride 16 is a trailer-based flying chair ride with removable tower sections. It packs into container-sized parts and reassembles on site, which suits operators touring between towns or shipping equipment overseas.
Self-levelling outriggers and quick-connect wiring shorten assembly time, while double harness seats and adjustable rotation speed let operators match local operating rules.
Typical Applications
Key Features
- Removable tower sections fit a 20ft container truck
- Self-levelling outriggers with load-spreading pads
- Quick-connect wiring for faster assembly
- Double harness seats and adjustable ride speed
Mobile Swing Ride 16 Buyer Guide
How the Mobile Swing Ride Is Built
The Mobile Swing Ride 16 is a flying chair ride designed around transport rather than around a fixed site. The tower is split into removable sections that fit standard container dimensions, and the base frame carries the outriggers, drive and control cabinet. This split makes the ride practical for operators who ship equipment between countries as well as for those touring regionally.
Seats are moulded FRP with double harness restraint, suspended on chains from the rotating crown. The crown ring is driven through a gearbox and brake assembly sized for the 16-seat load, and speed is adjustable from the control panel so operators can match local practice. Load-bearing welds are inspected before shipment and documented in the quality file.
Because the tower is assembled on site, every connection is designed for repeatable alignment. Spigot joints and guide pins remove guesswork during assembly, and the fasteners are marked so a pre-operation check can be completed by visual inspection. Corrosion protection is applied for outdoor exposure, with touch-up kits supplied for transport damage.
- Removable tower sections sized for container transport
- 16 FRP chairs with double harness restraint
- Adjustable rotation speed from the control panel
- Spigot joints and guide pins for repeatable assembly
Transport, Assembly and Site Preparation
The ride packs into container-sized parts and can be carried on a 20ft container truck or a flatbed with side stakes. Because the tower arrives in sections rather than as a complete trailer, the site needs enough space to lay parts out in assembly order. A typical layout plan is supplied with the manual so the crew can position sections before lifting begins.
Assembly sequence starts with the base frame and outriggers, followed by tower sections, crown, chairs and wiring. Quick-connect harnesses reduce terminal work, and self-levelling outriggers remove the need for separate screw jacks on uneven ground. A crew of three typically completes mechanical assembly in about half a day, with a further period for electrical checks and test runs.
The site should be level and firm, with enough clearance for the swing diameter of about eight metres plus a safety fence. Wind limits apply during assembly and operation, and the manual sets out the conditions under which work must stop. We recommend checking the weather window before scheduling assembly, especially in coastal or open-field locations.
Operating the Ride and Planning Capacity
With 16 chairs, a full cycle including loading takes roughly three to four minutes, which gives a moderate hourly capacity suited to fairgrounds and event sites where the ride is one of several attractions. Throughput improves when one attendant controls the boarding gate while the operator handles the panel, rather than one person attempting both.
Typical staffing is one operator and one attendant. The operator manages start, stop, speed and emergency controls; the attendant checks harnesses and confirms each chair before the cycle starts. Because chairs hang freely, the ride is not suitable in strong wind, and operations should pause when conditions exceed the limits in the manual.
Daily checks focus on harness condition, chain wear, crown fasteners and outrigger contact. Weekly checks add brake function and drive alignment. The design allows the crown to be locked for chair maintenance, and spare chains, harnesses and contactors are listed in the recommended spares kit.
Compliance and Documentation
The ride is built to EN 13814 practice with structural calculations for tower, crown and outrigger loads, and load testing is carried out before shipment. Certification requirements vary between markets, so we prepare the technical file for local submission rather than treating one certificate as universally accepted.
Documentation includes the operation manual, maintenance schedule, electrical drawings, load test report, foundation and ground pressure data, and a spare parts list. For export markets we also prepare packing lists and container loading plans so the receiving site knows which crate holds which assembly stage.
Operators should keep inspection records on file. Local inspectors commonly ask for evidence of routine checks, and insurers often ask similar questions after an incident. A simple log covering harness checks, fastener torque and brake tests is usually enough, provided it is completed consistently.
Customisation and Buying Considerations
Chair colours, canopy graphics and lighting packages can be adapted to a fairground identity or a rental fleet. Some operators choose a removable themed panel so the ride can be rebranded for sponsored events without repainting the structure.
Before ordering, clarify how the ride will move: container shipping, regional trucking or a mix of both. That decision affects packing, lifting points and the assembly sequence. We also ask about typical event duration, ground conditions and the number of setups per season, since a unit that moves weekly has different priorities from one that moves twice a year.
Frequently Asked Questions
How long does assembly take?
A crew of three typically completes mechanical assembly in about half a day, with additional time for electrical checks and test runs before opening. Quick-connect wiring and self-levelling outriggers shorten the process.
Does it fit into a shipping container?
The tower is split into sections sized around standard container transport. Packing lists and a container loading plan are prepared with each order so the receiving site can unload in assembly order.
What wind conditions stop operation?
The operation manual states the wind speed limits for both assembly and riding. Operations pause when conditions exceed those limits, which is common practice for suspended chair rides on open sites.
Which spares should a touring operator keep?
A recommended kit covers chains, harnesses, contactors, lamps and drive belts. Replacement intervals depend on cycles and site conditions, and the maintenance schedule lists the inspection points that determine wear.
Product Video
Transport, levelling and ride cycle footage for this trailer-mounted unit.

Video coming soon
Footage for this model is being prepared. Ask our team for the latest demo clip or a live video walkthrough.
